QN-A01Operating asset · sale of 100% of the subsoil user

Operating crushed-stone quarry with a crushing plant in Almaty Region

A construction-stone quarry with its own crushing and screening plant, equipment and on-site staff housing. Mining has been carried out since 2011 under a subsoil use contract. The site is about 10 km from Konaev and about 90 km from Almaty, 6.5 km from the A-3 Almaty — Ust-Kamenogorsk highway. The subject of the deal is 100% of the subsoil user company. Price and documents are provided after an NDA is signed.

Discuss QN-A01
Drone footage of the site, 0:59, no sound. Video provided by the seller.

Key figures

Approved reserves3,537.0 thousand m³ of construction stone (GKZ, 2010)
Remaining balance reserves3,081.76 thousand m³ as of 1 Jan 2025
Mineable reserves3,036.46 thousand m³ (losses 1.5%)
Design output315 thousand m³ per year, scheduled to 2035
Mining allotment area23.1 ha
Pit depthup to 31 m, 4 benches of 8 m
Stripping ratio0.172 m³/m³, overburden 0–5 m
Crushing plant capacityup to 250 t/h

Reserves are stated under Kazakhstan’s state classification (GKZ categories); this is not a JORC estimate. Figures are taken from the seller’s 2026 mining plan; our team verifies them before any deal.

Legal status

  • The contract for mining construction stone has been in force since 2011.
  • Extension of the contract to 2035 is under approval by the competent authority. According to the seller’s documents, negotiations on the amendments began in November 2025.
  • Checked 11.10.2026 based on the seller’s documents. We verify the status with state authorities before any deal.

Available after an NDA

  • 2026 mining plan with schedule and technical and economic indicators
  • Reserve approval protocol and geological report
  • Subsoil use contract, mining allotment and correspondence on the extension
  • Company registration documents
  • Video and photos in original quality

Geology and stone quality

  • The productive sequence is Permian volcanic rock: andesite-basalt porphyrites and their tuffs, and rhyolite tuff-lavas. No off-grade interlayers or internal waste were found during exploration.
  • Protodyakonov hardness f = 7–9, bulk density 2.44 t/m³. The rock is stable.
  • The deposit is dry; no groundwater was encountered during exploration.
  • Radiation hygiene class 1: the stone is suitable for all types of construction without restriction.
  • Physical and mechanical properties meet GOST 23845-86 (laboratory report). Crushed stone of 10–20 and 20–40 mm fractions is recommended as aggregate for heavy concrete and for road construction. Sand from crushing screenings meets GOST 8736-93.

Mining and processing

  • Open-pit mining with drilling and blasting; blasting is carried out by a licensed contractor.
  • Stationary crushing and screening plant: jaw and cone crushers, screen, conveyor lines.
  • Fractions 0–5, 5–15, 5–20, 20–40, 25–60 mm (GOST 8267-93).
  • Schedule: one shift, 260 working days a year, year-round.

Infrastructure and equipment

  • A 2,500 kW power line runs 100 m from the pit; 9 km of power lines were built to the plant.
  • Offices and a residential complex for staff, drinking and process water supply, diesel fuel tanks.
  • Equipment: EK 450FS excavator, three front loaders, SD22 bulldozer, four 30 t HOWO dump trucks, a water truck.

The exact set of property that passes with the shares is confirmed during due diligence.

Photos and video

  • Quarry site and crushing plant from above
  • Crushing and screening plant with product stockpiles
  • Conveyors and crushing unit
  • Screen and conveyor lines
  • Loader and dump truck at a crushed-stone stockpile
  • General view of the crushing plant with equipment
  • Crushing unit of the plant
  • Staff canteen
  • Staff accommodation room
  • On-site substation

Photos and video provided by the seller.

A sale of shares in a subsoil user company may require state permission for the transfer of the subsoil use right or of objects related to it (Code of the Republic of Kazakhstan on Subsoil and Subsoil Use). Whether and how the deal can proceed depends on its structure. QAZNEDR HOLDING does not own the asset: it is offered by the seller, and we support the due diligence and the deal. This material is not an offer and does not guarantee any return.

Discuss asset QN-A01

We send an NDA, then the mining plan, reserve and title documents, and the price. The asset code is already in the message.

WhatsApp

Message on WhatsApp

WeChat

Scan the QR code in WeChat and mention the area code.

QAZNEDR HOLDING WeChat QR code
Hello! I am interested in asset QN-A01 — the crushed-stone quarry with a crushing plant in Almaty Region. Please send the NDA and materials.
Contact