QN-203 · Stockwork of quartz veinlets with molybdenite in biotite granites and alaskites with greisenization (the authors assign it to the stockwork type of rare-metal deposits); beryllium (beryl, phenakite) is linked to albitization and greisenization
Molybdenum, beryllium, tungsten — Pavlodar Region
Average for an ore interval of a drill hole (core sampling):
molybdenum 0.105% over 21 m
- Two stockworks are outlined; the enriched parts are steeply dipping lenses and ore shoots in zones of the strongest fracturing. The beryllium halos do not coincide with the stockwork and molybdenum mineralization: they are confined to zones of fracturing, silicification, ferruginization, chloritization and fluoritization; ore minerals are molybdenite, pyrite, chalcopyrite, chalcocite, galena, bismuthinite
- The stockwork, marked by halos of molybdenum, bismuth, tungsten and beryllium, covers about 6 sq. km; only the area of the molybdenum halo, about 1 sq. km, has been studied. A metallometric survey outlined a molybdenum dispersion halo up to 15 km long (up to 0.02% in samples); mineralization with elevated contents is traced to a depth of 95–125 m
- Molybdenum in core drill holes (five holes about 100–200 m deep, core recovery 55–68.9%; the authors: core sampling gives “clearly understated contents”). Averages for ore intervals: 0.105% over 21 m, 0.072% over 16 m, 0.083% over 34 m, 0.058% over 83 m; range across samples 0.02–0.3%; in one interval core recovery is 38% and the authors doubt the reliability of the sampling
- For the forecast calculation the authors adopted molybdenum 0.06% for the enriched zone (this is not an average for the whole stockwork and not an average for a body); the authors describe the whole mineralized stockwork as 0.03–0.04%; the weighted average of the four intervals above is about 0.07% by the authors' own calculation. In one drill hole below 147 m molybdenum drops sharply (to 0.01% in individual samples)
- Trenches, molybdenum: ordinary values 0.01–0.06%, in individual samples and groups of samples 0.1–0.15%; in the central part of the halo, zones of 3–12 m with an average of 0.04% and higher; in one trench a zone 58 m long with an average of 0.06% (samples 0.02–0.3%) and a zone of 20 m with an average of 0.08%
- Beryllium, photoneutron logging of one drill hole (not a chemical analysis and not core sampling): over an interval of 2.65 m the average BeO is 0.17% (three peaks up to 0.8%, the figure in the source document is smeared); two more short intervals of 0.1%. Core samples from the same drill hole showed no beryllium increase
- Beryllium in trenches (photoneutron analysis of samples): ordinary samples are thousandths of a percent; one sample BeO 0.792% over a 1 m interval (the adjacent sample 0.065%, average over 2 m 0.428%; beryllium is not visible to the eye); single samples 0.089, 0.12 and 0.159%. Beryllium mineralization zones from tenths of a metre to 3 m thick with contents “from 0.1 to 0.8%” (range across zones); in one drill hole at a depth of 65–90 m separate beryl crystals and veinlet accumulations were found, and in a trench dump a beryl veinlet 2–3 mm thick
- Later work by another team (trenches up to 550 m in total length): molybdenum 0.01–0.6% (range across samples), tungsten 0.001–0.003%, beryllium 0.0002–0.0003%, rarely up to 0.005% in individual samples; this work did not show elevated beryllium. Single wolframite disseminations are noted only in quartz veins
- Geologists' forecast resources: an approximate calculation of 7.5 thousand t of molybdenum for the enriched zone of the stockwork (thickness 100 m, length 500 m, depth 100 m, bulk density 2.5 t/m³, content 0.06%); the dimensions were taken from the sampling plan and not outlined by workings; no category is given; this is a forecast, not reserves. The geologists did not calculate beryllium reserves
- Level of study: route prospecting, metallometric survey, magnetic, electrical and gamma surveys, trenches, pits, core drilling of five holes; beryllium in samples from workings was analysed by the photoneutron method. The authors: the work carried out is “clearly insufficient” to assess the site for beryllium; the stockwork field has not been crossed entirely by workings
Report fragments
Source: archival geological reports (scans in our archive)